Dongguan International Technology Transfer Center, 124 Dongbao Road, Dongcheng District, Dongguan, China
Request a quote
Centron Engineering News & Articles

Preventive Maintenance for the Injection Unit

NEWS

Most injection unit failures announce themselves weeks in advance. A schedule that catches them is cheaper than any spare part.

Daily

  • Check cushion stability and record it; a drifting cushion is the earliest wear signal
  • Look for resin drool around the nozzle and heater bands
  • Confirm all zones reach setpoint within the normal time
  • Listen for unusual noise from the injection unit during recovery

Monthly

  • Measure heater resistance and insulation to earth on each zone
  • Check terminal screws for tightness and discoloration
  • Inspect nozzle tip and seat for wear and damage
  • Verify barrel support and alignment; check for movement at the feed throat
  • Review shot weight records for drift

Annually, or on major service

  • Pull the screw and measure flight OD and barrel bore at three positions
  • Inspect the check ring and seat; replace as a set if worn
  • Inspect the screw for cracks at the flight root and at the drive end
  • Replace heater bands showing more than 10% resistance drift
  • Check barrel straightness and the condition of the feed throat liner

Record keeping that actually helps

A single measurement tells you little. A trend tells you when to order parts. Keep a one-page log per machine: date, cushion, recovery time, shot weight, heater resistances, and any work done. When the trend bends, you have weeks of warning instead of a breakdown on a Friday afternoon.

If you would rather work from a checklist, we can supply one matched to the machine and the resin. Related parts: screws, barrel heaters, nozzles.